Crimsonnaire
Member
Hi, everyone.
I've been looking to get a UPS for my desktop computer, but the thing is that I'm only looking to back up my tower and nothing else. So I've been trying to decide which UPS model is best for me, but I'm not sure how many watts my tower consumes.
The tower itself is an old eMachines T2862 model, but it has an upgraded motherboard, and a hard disk drive from an older eMachines T1090 tower was added. Can someone please give me an estimate based on the following details?
PowerSpec motherboard: 1GB RAM & Intel Celeron E1200 @ 1.60GHz, 1.60GHz
Two hard disk drives: Master drive = 60GB + Slave drive = 18.6GB
One Optical drive: CD-RW/DVD-R
Typical commit charge (K) total: 700000/2501036
Typical physical memory (K) total: 520000/1039596
Typical number of processes: 44
Any information is greatly appreciated.
I've been looking to get a UPS for my desktop computer, but the thing is that I'm only looking to back up my tower and nothing else. So I've been trying to decide which UPS model is best for me, but I'm not sure how many watts my tower consumes.
The tower itself is an old eMachines T2862 model, but it has an upgraded motherboard, and a hard disk drive from an older eMachines T1090 tower was added. Can someone please give me an estimate based on the following details?
PowerSpec motherboard: 1GB RAM & Intel Celeron E1200 @ 1.60GHz, 1.60GHz
Two hard disk drives: Master drive = 60GB + Slave drive = 18.6GB
One Optical drive: CD-RW/DVD-R
Typical commit charge (K) total: 700000/2501036
Typical physical memory (K) total: 520000/1039596
Typical number of processes: 44
Any information is greatly appreciated.
Last edited: