Geoff
VIP Member
*This is my last thread, lol*
All of my parts came in Thursday and Friday, I was up until 3AM building the computer and installing Vista, the water cooling took the most amount of time. I made a video of me turning on the water cooling system for the first time (I thought, hey if it leaks water everywhere, it would be cool to have on video
).
Anyways, here are a few of the photos I took, which are all in chronological order.
(Benchmarks will be at the end, shortly).
(I was upgrading my server as well, which now uses the Antec 900 Case)
CMOS reset button on the back, best thing ever!!
All of my parts came in Thursday and Friday, I was up until 3AM building the computer and installing Vista, the water cooling took the most amount of time. I made a video of me turning on the water cooling system for the first time (I thought, hey if it leaks water everywhere, it would be cool to have on video
Anyways, here are a few of the photos I took, which are all in chronological order.
(I was upgrading my server as well, which now uses the Antec 900 Case)
CMOS reset button on the back, best thing ever!!
Last edited: